By David Stymiest, PE, CHFM, FASHE
In In his recent ASHE Annual Conference presentation, George Mills of TJC reminded attendees about the requirements for current LS plans. Much of this information is in a related February 2012 EC News article and is summarized below.TJC Standard LS.01.01.01, EP 2, requires an organization to have a current Statement of Conditions™ (SOC™). EP2 is scoring category A with documentation required. In order to have a current SOC™ an organization must create and maintain an up-to-date and complete Basic Building Information (BBI). Since the BBI requires organizations to indicate the location of current LS drawings, not being able to supply those current LS drawings during a survey can result in a direct impact RFI against EP2.
TJC has stated that current LS drawings must address the following topics:
