Showing posts with label Electrical Shutdown. Show all posts
Showing posts with label Electrical Shutdown. Show all posts

Tuesday, October 2, 2012

Compliance News:  ASHE Publishes New Management Monograph "Managing Hospital Electrical Shutdowns" 

by David Stymiest, PE, CHFM, CHSP, FASHE 

ASHE recently published a new management monograph that provides guidance for managing safe electrical shutdowns. It is available free of charge as a downloaded protected PDF to all ASHE members at :
http://www.ashe.org/resources/management_monographs/mg2012stymiest.html.

Hard copies are also available to both ASHE members and non-members in the ASHE Online Store as ASHE catalog # 055978.

This 55-page monograph covers the following major topics in depth:

  • Why electrical shutdowns should be planned
  • Things to consider before planning a shutdown
  • Planning a shutdown
  • Electrical system considerations during a shutdown
  • After the shutdown
  • Planning for future shutdowns
  • Numerous appendices with samples and templates to assist hospitals in their shutdown management activities

Our Compliance News readers are welcome to submit comments, suggestions and questions by email to: DStymiest@ssr-inc.com.

Tuesday, September 11, 2012

RISK + REWARD 
Assessing the need for electrical system shutdowns

By David L. Stymiest, P.E., CHFM, FASHE


Citing concerns for worker safety, tighter insurance requirements and Occupational Safety and Health Administration enforcement actions, most electrical contractors and electrical service companies now do their work in accordance with the National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace.

They are no longer willing to maintain or to modify "hot," or energized, electrical equipment. Consequently, increasing numbers of hospitals have been undertaking the field investigations and electrical system studies necessary for applying those ubiquitous arc flash labels on electrical equipment. What's more, new maintenance requirements have increased the urgency of this process.

Read the entire article at HFM Magazine

Monday, August 6, 2012

Assessing the need for hospital electrical system shutdowns

Risk + Reward - Assessing the need for electrical system shutdowns

By David L. Stymiest, P.E., CHFM, FASHE

Consider conducting Shutdown Risk Assessments

This article first appeared in the August 2012 issue of HFM magazine.

NFPA disclaimer: Although the author is chairman of the NFPA tech­nical committee on emergency power supplies, which is responsible for NFPA 110 and 111, the views and opinions expressed in this article are purely those of the author and shall not be considered the official position of NFPA or any of its technical committees, and shall not be considered to be, nor be relied upon as, a formal interpretation of the discussed standards.

Citing concerns for worker safety, tighter insurance requirements and Occupational Safety and Health Administration enforcement actions, most electrical contractors and electrical service companies now do their work in accordance with the National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace.

They are no longer willing to maintain or to modify "hot," or energized, electrical equipment. Consequently, increasing numbers of hospitals have been undertaking the field investigations and electrical system studies necessary for applying those ubiquitous arc flash labels on electrical equipment. What's more, new maintenance requirements have increased the urgency of this process.

Tuesday, April 12, 2011

Powering Down: An orderly process for switching off hospital electrical equipment

By David L. Stymiest, P.E., CHFM, FASHE (in Hospital Engineering Trends Sept/Oct 2004)
  

An electrical shutdown is a carefully managed process whereby electrical equipment is switched off for various reasons, including crucial maintenance, training, expansion and repair; and then turned back on again with minimal impact to patients.
  
Electrical shutdowns can be performed safely and hospitals can gain added benefits from their electrical shutdowns if they also use them to train clinical and support staff in how to deal with power outages. Hospitals taking this approach are continuously improving their environment of care.
  
The right time?
Hospitals need to plan electrical shutdowns whenever modifications must be made to the equipment. Industry experts will tell you that working “hot” is never a good idea if there is any other way. A well-planned shutdown is that other way, and it is required in many instances. For example, it should be planned shortly after completion of construction/renovation (C/R) activity in the vicinity of the electrical equipment, even if the electrical system itself is new.

Read entire article here: Powering Down