During a recent survey, a surveyor asked for our current LS drawings. We were unable to provide them, and the surveyor gave us a Requirement for Improvement (RFI), stating that we did not have a current Statement of Conditions (SOC). What is the link between current LS drawings and the SOC? What is required in a current set of LS drawings?