By David Stymiest, PE, CHFM, CHSP, FASHE
In the January 2014 editions of both TJC Perspectives and TJC EC News, TJC Director of Engineering George Mills listed numerous clarifications and expectations for emergency power systems. Below are the design-related issues that he covered.
