Monday, February 20, 2012

Smooth Start: Ensuring Emergency Power System Performance

Smooth Start
Ensuring emergency power system performance

This article first appeared in the February 2012 issue of HFM Magazine.
By David L. Stymiest, P.E., FASHE, CHFM

Like all other mission-critical systems, emergency power systems should be commissioned to attain the necessary operational reliability.

Emergency power system commissioning (Cx) can be considered a documented quality assurance program that finds and resolves potential emergency power system-related problems before patients are admitted and procedures are performed.

Emergency power system Cx is not the same as doing walk-throughs of the emergency power system and creating punch lists. Punch lists simply report what their preparers observed to be incorrect; whereas the Cx process can document that the installed equipment and systems are correct.

No comments:

Post a Comment